Refurbishment Process

Refurbishment Process

This Business Scenario Map shows a comprehensive, cross-industry process that streamlines the refurbishing of serialized equipment by seamlessly integrating it with the maintenance cycle. The refurbishment solution links technical assets (equipment) to the material master and allows condition-based stock management. Any refurbishment activity has an impact on the stock value of the material (equipment).

Show Document Flow
Maintenance Engineer
Maintenance Planner
Senior Storeman
Make confirmations for order
Refurbish equipment
Receive equipment
Replace faulty equipment
Post to stock with new condition-based value
Complete refurbishment order
Create and release refurbishment order
Post to stock with condition-based value
Withdraw equipment
Store equipment
.
 

Refurbishment Process

The refurbishment of equipment is seamlessly integrated with the maintenance cycle. Technical assets (serialized equipment) are linked to the material master and can be managed in condition-based stocks. Any refurbishment activity performed influences the overall stock value of the material (equipment). The refurbishment process includes maintenance planners, maintenance technicians and storage men to form a team in the maintenance of equipment. After a maintenance technician has determined and replaced a faulty equipment, the maintenance planner posts the defective item to stock. He can specify the decrease in value by setting a specific valuation type for the item. After several defective items have been posted, the maintenance planner creates and releases a refurbishment order for the given items. These will be withdrawn from stock and refurbished by the maintenance technician. After finishing the repairs, the technician can make the confirmations for the order. Subsequently, the maintenance planner completes the order by posting a goods receipt to stock using a higher valuation type. The stock value changes dynamically according to the condition of the items, with the price of a refurbished item covering all internal and external material and labor costs spent on refurbishing.